We teamed up with City Point Partners and the MBTA to create a video detailing the upcoming North Station Draw One Bridge replacement.

The project includes replacement and modernization of the existing drawbridge, replacement of a control tower, an extension of the bridge platform adding tracks 11 and 12 to the network, and upgrades to track, signal, communications, and infrastructure.

It’s a significant project currently in the design phase, and City Point and the MBTA wanted to create this video to spread awareness and educate the public on the project.

We captured footage of the location, interviewed project team members, and spliced in historical, current, and design footage of the Draw One Bridge to give Boston commuters an inside look at the work to come.

Recent Projects

Explore Our Project Success Stories

A person stands behind a white desk with a city skyline and evening sky in the background. The text reads: "path8 CASE STUDY.
Company Story Videos
HealthcarePublic Health & Policy

Case Study: Boston Public Health

At path8, we work hard to make working with us […]
Learn More
A man sitting in front of a window, showcasing the path8 case study for a Boston Video Production Company.
GeneralLive Events
General

Case Study: TRACS

Oftentimes, production environments have a lot of moving parts. When […]
Learn More
A digital shield icon and the text "2024 Blue Knight Symposium" are displayed on a dark blue background.
Conference videos
HealthcarePublic Health & Policy

Johnson & Johnson's BLUE KNIGHT Symposium

The team at Johnson & Johnson’s BLUE KNIGHT program turned […]
Learn More

Stay Informed and Inspired

Subscribe to our newsletter
for exclusive updates

Go to Top